0009 — Agent merge of mergeable PRs, and a review gate for human review¶
- Status: ratified
- Number: 0009
- Date: 2026-10-30
- Proposed by: Grok Bot (agent), for Amr
- Ratified by: https://github.com/bamr87/bamr87/pull/481 (merged 2026-10-31 by @bamr87)
- Affects: constitution § 4, new § 12; AGENTS.md "Never"; feature
HUB-045; requirementFR42 - Supersedes: none (§ 8 step 2 and § 11.2 are unchanged)
- Related: fleet-wide repo amendments that conform to this one; it-journey editorial charter PR bamr87/it-journey#889; prior-art proposal #480 (no overlap)
Context¶
§ 4 forbids an agent from merging its own PRs, so every green, routine PR waits on the maintainer. The fleet rule is changing: agents may merge, but only a PR that meets an explicit mergeable definition, and anything that needs human review must pass a review gate first.
Amendment¶
§ 4's AI-agent row: "May" gains "merge a PR that is mergeable under § 12"; "May not" changes "Merge its own PRs" to "Merge a PR that is not mergeable under § 12, or any PR the review gate holds".
New § 12 "Merge authority and the review gate" (full text in docs/constitution.md):
- Mergeable PR checklist — all of: (1) required CI checks green; (2) required reviews satisfied; (3) no merge conflicts; (4) the review gate passed wherever human review is required — rechecked against live state just before merging. Otherwise the agent waits.
- How — merge commits only; no squash/rebase, no
--adminor bypass, no force-push. - Gated categories — amendments, constitution or standards; secrets, tokens, budgets, billing; settings, branch protection, rulesets, permissions; security-sensitive changes; deploys or anything touching the maintainer's machines; non-trivial conflicts; destructive or data-deleting changes; items labelled
agent:hold,blockedorneeds-amr; repo-specific content gates (e.g. it-journey's editorial charter for structural changes). - Mechanism —
needs-amrlabel + Fleet project status Needs Amr; passes only on maintainer approval/merge and label removal; optional required review in branch protection, turned on only by the maintainer. - Never — agents never merge gated PRs; amendments are ratified only by the maintainer merging.
- Conformance — each repo constitution conforms or files its own amendment.
Consequences¶
- Agents may close out routine green PRs; gated work still waits for Amr.
- Each fleet repo with a constitution gets a conforming amendment PR (fan-out).
- Follow-up: a
needs-amrlabel and a check that fails while it is present (featureHUB-045); the project status option Needs Amr must exist on the Fleet project.