Decisions for bamr87 that are hard to reverse — the stack, data model, security model, public interfaces, and any relaxation of a gate — one file each.
Add an ADR in the same PR as the change it justifies.
Proposed in the PR that adds the ADR, or that adds a phase section with its own - **Status**: proposed line.
Accepted by the merge. The maintainer's merge of that PR accepts it (the maintainer's ruling of 2026-11-01, amendment ratification-records). Because the merge is the decision, a PR that adds or changes an ADR is gated (constitution § 12.3): no agent merges it. The post-merge ratify job in jev-number.yml then sets that line to accepted (the rest of the line stays), adds - **Accepted in**: <PR URL> (merged YYYY-MM-DD by @login) under it, and sets the status cell of the row below (header line only). A PR merged by anyone else, from one of the hub's automation branches or opened by a bot accepts nothing. GitHub cannot tell the maintainer's own merge from one made with FLEET_TOKEN (both read bamr87); the gate is what makes merged_by mean the maintainer, and until a distinct bot identity exists that rests on § 12.5 being kept.
Completed when the tracking epic closes. When the maintainer closes the issue named by Tracking as completed and every one of its sub-issues is closed, the job adds - **Completed**: YYYY-MM-DD (#N closed) to the header of an accepted ADR. An issue closed by anyone else, or as not planned, leaves it pending.
Accepted in and Completed are written by the job through a ratification-record PR (constitution § 12.3), never by hand. Run python3 -m tools.jev ratify plan to see what it would record (docs/JEV.md).