0003 — GitHub Projects as the fleet's system of record for work¶
- Status: ratified
- Date: 2026-10-29
- Proposed by: Grok Bot (Fleet Ops / Platform Architect) for bamr87
- Ratified by: https://github.com/bamr87/bamr87/pull/439 (merged 2026-10-30 by @bamr87)
- Affects: constitution § 6 (change process), § 7 (quality gates), new § 9 (work tracking); PRD FR-NEW:projects-coverage, FR-NEW:projects-sync, NFR-NEW:projects-scope-honest; features HUB-NEW:github-projects-framework, HUB-NEW:projects-coverage-gate, HUB-NEW:projects-sync-console (fragments in
features/features.d/; ids assigned at merge per amendment 0002) - Supersedes: none
- Related: docs/PROJECTS-FRAMEWORK.md, templates/projects/framework.yml
Numbering: 0002 is conflict-free numbering; 0003 was still free when main was merged in. The feature and requirement ids are assigned by
tools/jev/number.pyat merge.
Context¶
Work across ~42 repos in bamr87 and five orgs is tracked by labels (agent:*, P0–P3, size:*, area:*), the issue pipeline and _data/fleet_triage.yml, but there are no GitHub Projects (v2) linking it, labels differ by repo, milestones are unused, and nothing ties an issue or PR to a feature id (HUB-NNN) or PRD requirement. The gh token in the harness lacks the project scope, so no tool can read or write projects today.
Amendment¶
- Every open issue and PR in a registry repo belongs to the fleet portfolio project and, where one exists, its domain project, with the required fields of
templates/projects/framework.yml(Status, Priority, Area, Repo; Feature ID / PRD req when the item changes a feature or requirement). templates/projects/framework.ymlis the single source for projects, fields, options, lifecycle states and the label map; projects and labels are reconciled from it, never edited by hand.- Status follows one lifecycle: Inbox → Triaged → Ready → In progress → In review → Done (| Blocked, Won't do). The
agent:*labels mirror Status, not the reverse. tools/projects_lint.pyjoins the quality gates: offline it validates the framework spec; with project read access it reports items missing from a project or missing required fields (warning for 30 days after ratification, then error).- Agents and bots change project items only through the console MCP layer or the sanctioned sync workflow, never by hand-built API calls.
Consequences¶
The hub gains a constitution § 9, three feature ids and three requirements. Rollout (docs/PROJECTS-FRAMEWORK.md) is phased; creating projects, editing labels and granting the token scope happen only after ratification.